Monday 23 May 2016

Installing cooling tower for heat exchanger

- temperature of the syngas from biomass gasifier need to be cool before entering water scrubber to avoid steam production
- heat exchanger is used to to the job
- the hot water is cool by using cooling tower

 Fitting the pipe

Finishing job




 Cooling tower is ready...

Install and testing Industrial water scrubber

- the water scrubber is ready for installation
- the installation take at about 2 days including piping and some modification







 Installation of water scrubber in progress...

Fabrication of Industrial water scrubber

- The company face a problem to cater heavy smoke during pyrolyse municipal solid waste.
- They need water scrubber that can cater the problem
- We come out with solution...

 Installing flange and fitting

 Fabrication water scrubber in progress

 Water scrubber ready for finishing

 Water scrubber ready for shipping

Unload water scrubber at site